Assembly scheme for the Photon-beamdump at the nuclear physics setup (NP-CBG.01)


Basics

The basics principle of operation of the photon-beam dump is described here(1).

Assembly scheme

The assembly scheme has been developed by Mr. Roland Beyer who did his laboratory practice in the institute from 1.8.2001 until 14.9.2001. Mr. Beyer is a physics student at the university of Jena/Thuringia.
View from above
Front view
Left view
Right view
Standard bricks used
Specially cut bricks
Beam pipe hole

(2)


URL of this article
https://www.hzdr.de/db/Cms?pOid=11150


Links of the content

(1) https://www.hzdr.de/FWK/MITARB/wagnera/nrf/docu/de/NP-CBG.01.html
(2) https://www.hzdr.de/db/Cms?pOid=11156