Electron Bunch Diagnostic at the Upgraded ELBE Accelerator: Status and Challenges


Electron Bunch Diagnostic at the Upgraded ELBE Accelerator: Status and Challenges

Kuntzsch, M.; Findeisen, S.; Gensch, M.; Green, B. W.; Hauser, J.; Kovalev, S.; Lehnert, U.; Michel, P.; Roeser, F.; Schneider, C.; Schurig, R.; Kaya, C.; Al-Shemmary, A.; Bousonville, M.; Czwalinna, M. K.; Golz, T.; Schlarb, H.; Schmidt, B.; Schulz, S.; Stojanovic, N.; Vilcins, S.; Hass, E.

Within the ELBE upgrade towards a Center for High Power Radiation Sources (HSQ), a mono energetic positron, a liquid lead photo neutron source and two new THz sources have been installed at the superconducting electron linac at ELBE. A variety of established as well as newly developed electron beam diagnostics were installed and tested. In this paper we want to present first results achieved with the currently existing prototype beam arrival time and bunch compression monitors (BAM, BCM) as well as one versatile EOS set-up. Based on these future developements and upgrades are discussed.

Keywords: ELBE Bunch Diagnostic

Related publications

  • Lecture (Conference)
    International Beam Instrumentation Conference IBIC 2013, 16.-19.09.2013, Oxford, United Kingdom
  • Open Access Logo Contribution to proceedings
    International Beam Instrumentation Conference IBIC 2013, 16.-19.09.2013, Oxford, United Kingdom
    Proceedings of IBIC 2013

Permalink: https://www.hzdr.de/publications/Publ-19169
Publ.-Id: 19169