Picture gallery: Installation of the 150 TW Laser Lab at ELBE
2/2010 | Commissioning of the ELBE taret area - first electron beams |
|
7/2009 | Laser-proton acceleration with Draco yields energies above 15 MeV in the TNSA regime
|
|
5/2008 | Inauguration of the high-intensity-laser-lab |
|
4/2008 | Installation of the 150 TW Laser and one experimental area |
|
12/2007 | Delivery of the 150 TW Laser (Amplitude Technologies) |
|
11/2007 | Installation of the target chamber |
|
Installation of optical tables |
||
08/2007 | Construction of the laser lab inside the ELBE building |
|
04/2007 | View of the SW-corner of the ELBE area indicating the footprint (red tape) of the laser building and showing the entrance to the shielded experimental area |
|
12/2006 | Decision for a 100TW laser lab inside the ELBE building |
|
11/2006 | Formation of the "laser-particle-acceleration group" at HZDR Bericht im HZDR Intern 43, p. 2-3 (12/2006) |
|