| |
|
|
| |
2/2010 |
Commissioning of the ELBE taret area - first electron beams

|
| |
|
|
| |
7/2009 |
Laser-proton acceleration with Draco yields energies above 15 MeV in the TNSA regime

|
| |
|
|
| |
5/2008 |
Inauguration of the high-intensity-laser-lab

|
| |
|
|
| |
4/2008 |
Installation of the 150 TW Laser and one experimental area

|
| |
|
|
| |
12/2007 |
Delivery of the 150 TW Laser (Amplitude Technologies)

|
| |
|
|
| |
11/2007 |
Installation of the target chamber

|
| |
|
Installation of optical tables

|
| |
|
|
| |
08/2007 |
Construction of the laser lab inside the ELBE building

|
| |
|

|
| |
|
|
| |
04/2007 |
View of the SW-corner of the ELBE area indicating the footprint (red tape) of the laser building and showing the entrance to the shielded experimental area

|
| |
|
|
| |
12/2006 |
Decision for a 100TW laser lab inside the ELBE building

|
| |
|
|
| |
11/2006 |
Formation of the "laser-particle-acceleration group" at HZDR
Bericht im HZDR Intern 43, p. 2-3 (12/2006) |
| |
|
|