New developments at the Rossendorf electrostatic accelerators


New developments at the Rossendorf electrostatic accelerators

Friedrich, M.; Bürger, W.; Turuc, S.; Tyrroff, H.

The Rossendorf electrostatic accelerator facility, consisting of three accelerators with rated voltages of 2 -5 MV, has been extended by a 100 kV tandem accelerator for tritium depth profiling by AMS and by concentration of two implanters at the same location. Two experimental chambers were installed, which give the possibility of dual beam experiments using the beams from the 3 MV tandetron and from the 500 kV implanter. At the 5 MV tandem the original inclined field acceleration tubes were exchanged by straight field tubes with spiraling magnetic field. First results of the accelerator modernisation and of the beam line extension are presented.

Keywords: Electrostatic accelerators

  • Lecture (Conference)
    Proceedings of the 35th Symposium for Northeastern Accelerator Personnel (SNEAP), Lund/Sweden, 22nd-25th November 2001
  • Lecture (Conference)
    Proceedings of the 35th Symposium of the North Eastern Accelerator Personnel, Lund, Sweden, Oct. 22-26, 2001; Eds. R. Hellborg, M. Faarinen, C.E. Magnusson, P. Persson, G. Skog, K. Stenström, Lund University, Dept. of Physics, 2002, p. 257
  • Contribution to proceedings
    Symposium of North Eastern Accelerator Personnel SNEAP 19, Lund University, Sweden, 22-25 October 2001, Editors: R. Hellborg, M. Faarinen, C.E. Magnusson, P. Persson, G. Skog, K. Stenström, ISBN 91-631-2676-1, Lund University 2002

Permalink: https://www.hzdr.de/publications/Publ-4127
Publ.-Id: 4127