Machine Protection System Upgrade for a new Timing System at ELBE


Machine Protection System Upgrade for a new Timing System at ELBE

Justus, M.; Kuntzsch, M.; Schwarz, A.; Zenker, K.; Oven, Z.; Perusko, L.; Krmpotic, L.; Legat, U.; Rojec, U.

Running a C.W. electron accelerator as a user facility for more than two decades necessitates upgrades or even complete redesign of subsystems at some point. At ELBE, the outdated timing system needed a replacement due to obsolete components and functional limitations. Starting in 2019, with Cosylab as contractor and using hardware by Micro Research Finland, the new timing system has been developed and tested and is about to become operational. Besides the ability to generate a broader variety of beam patterns from single pulse mode to 26 MHz C.W. beams for the two electron sources, one of the benefits of the new system is improved machine safety. The ELBE control systems is mainly based on PLCs and industrial SCADA tools. This contribution depicts how the timing system implementation to the existing machine entailed extensions and modifications of the ELBE machine protection system, i.e. a new core MPS PLC, and how they are being realized.

Keywords: ELBE; MPS; Machine Protection System; Timing System; MRF; Control System

Involved research facilities

Related publications

  • Poster
    ICALEPCS 2023, 09.-13.10.2023, Cape Town, South Africa
  • Open Access Logo Contribution to proceedings
    ICALEPCS 2023 - 19th International Conference on Accelerator and Large Experimental Physics Control Systems, 09.-13.10.2023, Cape Town, South Africa
    Proceedings of the 19th International Conference on Accelerator and Large Experimental Physics Control Systems, Geneva, Switzerland: JACoW Publishing, 978-3-95450-238-7, 542-546
    DOI: 10.18429/JACoW-ICALEPCS2023-TUPDP021
    ISSN: 2226-0358

Permalink: https://www.hzdr.de/publications/Publ-37109