Contact

Dr. Roland Beyer

Beam line scientist, radiation protection officer FWK
Nuclear Physics
roland.beyer@hzdr.de
Phone: +49 351 260 3281

nELBE Cabling Scheme

(old version up to May 2014)

Plastic:

PMT Base HV Signal HV setting / V
Cable CIO Card / ch Cable Patch field
Scanner H* up
(EJ 230)
55 T1 05 / 4 1 (12m)  19 3000
Scanner H* down
(EJ 230)
 10 T2 05 / 5   2 (12m)  20 2630
Scanner V* left**
(EJ 200)
 1

T3

05 / 6

 3 (12m) 29 3000
Scanner V* right**
(EJ 200)
 26 T4 05 / 7 4 (12m) 30 2650

* Scanner H/V is the scanner detector that moves in horizontal/vertical direction
** in direction of the beam

U-235 Fission Chamber:

Deposit Signal HV
Channel Cable (7m)
Patch field Cable Patch field
1 1 1 1 11 11
2 11 11
2 1 2 2
2 12 12
3 1 3 3
2 13 13
4 1 4 4
2 14 14
5 1 5 5
2 15 15
6 1 6 6
2 16 16
7 1 7 7
2 17 17
8 1 8 8
2 18 18

Pu-242 Fission Chamber:

Deposit Signal HV
Channel Cable (7m)
Patch field Cable Patch field
1 1 19 21 12 12
2 27 31
2 1 20 22
2 28 32
3 1 21 23
2 29 33
4 1 22 24
2 30 34
5 1 23 25
2 31 35
6 1 24 26
2 32 36
7 1 25 27
2 33 37
8 1 26 28
2 34 38

Patch field:

Patch field BNC

Used for

Patch field BNC

Used for

Patch field BNC Used for
1 U FC 1.1 21 Pu FC 1.1 41  
2 U FC 2.1 22 Pu FC 2.1 42  
3 U FC 3.1 23 Pu FC 3.1 43  
4 U FC 4.1 24 Pu FC 4.1 44  
5 U FC 5.1 25 Pu FC 5.1 45  
6 U FC 6.1 26 Pu FC 6.1 46  
7 U FC 7.1 27 Pu FC 7.1 47  
8 U FC 8.1 28 Pu FC 8.1 48  
9  Target input 29  Scanner V left 49  
10 Target output 30  Scanner V right 50  
11 U FC 1.2 31 Pu FC 1.2 51  
12 U FC 2.2 32 Pu FC 2.2 52  
13 U FC 3.2 33 Pu FC 3.2 53  
14 U FC 4.2 34 Pu FC 4.2 54  
15 U FC 5.2 35 Pu FC 5.2 55  
16 U FC 6.2 36 Pu FC 6.2 56  
17 U FC 7.2 37 Pu FC 7.2 57  
18 U FC 8.2 38 Pu FC 8.2 58  
19 Scanner H up 39   59  
20  Scanner H down 40   60  

Patch field SHV

Used for

1 LaB3 1
2 LaB3 2
3 LaB3 3
4 LaB3 4
5 LaB3 5
6 HPGe 1
7 HPGe 2
8 HPGe 3
9 HPGe 4
10 HPGe 5
11 U FC
12 Pu FC
13  
14  
15  
16  
17  
18  
19  
20  
21  
22  
23  
24  
25