nELBE Cabling Scheme
PMT | Base | HV | Signal | HV setting / V | ||
Cable | CIO Card / ch | Cable | Patch field | |||
Scanner H* up (EJ 230) |
55 | T1 | 05 / 4 | 1 (12m) | 19 | 3000 |
Scanner H* down (EJ 230) |
10 | T2 | 05 / 5 | 2 (12m) | 20 | 2630 |
Scanner V* left** (EJ 200) |
1 |
T3 |
05 / 6 |
3 (12m) | 29 | 3000 |
Scanner V* right** (EJ 200) |
26 | T4 | 05 / 7 | 4 (12m) | 30 | 2650 |
* Scanner H/V is the scanner detector that moves in horizontal/vertical direction
** in direction of the beam
U-235 Fission Chamber:
Deposit | Signal | HV | |||
Channel | Cable (7m) |
Patch field | Cable | Patch field | |
1 | 1 | 1 | 1 | 11 | 11 |
2 | 11 | 11 | |||
2 | 1 | 2 | 2 | ||
2 | 12 | 12 | |||
3 | 1 | 3 | 3 | ||
2 | 13 | 13 | |||
4 | 1 | 4 | 4 | ||
2 | 14 | 14 | |||
5 | 1 | 5 | 5 | ||
2 | 15 | 15 | |||
6 | 1 | 6 | 6 | ||
2 | 16 | 16 | |||
7 | 1 | 7 | 7 | ||
2 | 17 | 17 | |||
8 | 1 | 8 | 8 | ||
2 | 18 | 18 |
Pu-242 Fission Chamber:
Deposit | Signal | HV | |||
Channel | Cable (7m) |
Patch field | Cable | Patch field | |
1 | 1 | 19 | 21 | 12 | 12 |
2 | 27 | 31 | |||
2 | 1 | 20 | 22 | ||
2 | 28 | 32 | |||
3 | 1 | 21 | 23 | ||
2 | 29 | 33 | |||
4 | 1 | 22 | 24 | ||
2 | 30 | 34 | |||
5 | 1 | 23 | 25 | ||
2 | 31 | 35 | |||
6 | 1 | 24 | 26 | ||
2 | 32 | 36 | |||
7 | 1 | 25 | 27 | ||
2 | 33 | 37 | |||
8 | 1 | 26 | 28 | ||
2 | 34 | 38 |
Patch field:
|
|